3000mm x 3000mm MRD Box Culverts for the
Coronation Road Bridge Upgrade, Waroona

Project Overview Coronation Road is the main connection between Waroona, Preston Beach and Lake Clifton. It will be widened and upgraded from a single lane to two lanes. This was an important regional project because not only is the road commonly used by local residents, it is also the key access route for emergency services in Waroona to reach the shire’s coastal localities. The project will:
  • It will reduce travel time for local industry and emergency services.
  • increase commercial viability of new businesses in the area and improve tourism links
  • Importantly, the upgrade will contribute to an enhanced network of transport supporting local businesses and enabling expansion
  • Cut travelling time between Waroona and the Coastal Facilities
MJB Industries products supplied 36 x 3000mm x 3000mm x 1.20m MRDWA Box Culverts manufactured to 1597.2 and Main Roads Specification 404.
MJB INDUSTRIES
CONCRETE PIPE & PRECAST PRODUCTS

PHONE NUMBER:
+61 (8) 9797 0999

ENQUIRIES WELCOME
Questions marked by * are required.
Name: *
Email: *
Phone:
Details: