Projects and customer testimonials
Main Roads WA
Arthur Creek, East Kimberly Region of Western Australia
2.4m x 2.4m x 1.2m Reinforced Concrete Box Culverts
Main Roads are happy with the quality of the boxes MJB produced
Project Manager
Main Roads WA
EDC Footings Worsley Alumina
1. Preparation of footing before concrete pour
Preparing a footing before a concrete pour is one of the most critical steps in ensuring the strength, stability, and longevity of a structure.
2 Customer spec concrete inspected and poured
The concrete mix was verified to meet the customer’s specifications and inspected for compliance before pouring.
3. Specialised footings in place on site
Specialised footings have been accurately positioned and installed on site in accordance with the engineering design.
I am happy with MJB’s conduct and communication, and we are always able to come to an understanding on deliveries to suit the site crew and MJB. They are always helpful and I will happily use them again.
MJB always help us out when we need emergency orders with a minimum of fuss, SRS greatly appreciate what MJB do for us in these times. Any other time deliveries are always made on promised days and the product arrive in great condition, affiliates of MJB i.e. truck drivers etc also make dealing with MJB smooth and easy.
You are great to work with, looking forward to future business












