by admin | Oct 14, 2025 | Uncategorized
Project Overview Our South West Region is undertaking a project to realign a 1.7km section of the South Western Highway in Burekup between Russell Road and Raymond Road. This will include the construction of a new bridge over the Collie River and a culvert over the...
by admin | Oct 14, 2025 | Uncategorized
Project Overview Coronation Road is the main connection between Waroona, Preston Beach and Lake Clifton. It will be widened and upgraded from a single lane to two lanes. This was an important regional project because not only is the road commonly used by local...
by admin | Oct 14, 2025 | Uncategorized
MJB supplied 36 x Concrete Deck Planks 4 Meters long with varying widths. The panels were manufactured with a 50mpa concrete mix that included the Hydrophobic Pour-blocking Ingredient Xypex C-5000 and was completed with a ‘broomed’...
by admin | Oct 9, 2025 | Uncategorized
MJB was awarded an order from the Shire of Harvey to manufacture 12 x 4.25m x 1.5m Boat Ramp Panels for the replacement Boat Ramp in Australind. The panels were required to have a herringbone pattern. The customer required galvanized reinforcing with stainless steel...
by admin | Oct 9, 2025 | Uncategorized
MJB was awarded an order from the Shire of Harvey to manufacture 12 x 4.25m x 1.5m Boat Ramp Panels for the replacement Boat Ramp in Australind. The panels were required to have a herringbone pattern. The customer required galvanized reinforcing with stainless steel...